YA Creative Design Partners completed a mechanical engineering assessment of a recurring moisture condition on the third floor of a three-story self-storage facility in Lake Forest, CA.
For several years, the building had intermittent ceiling drips and puddling across most of the third-floor hallways, and the problem got worse in warmer months. Our scope included a review of the original 2001 permit set, field verification of the existing ventilation equipment and ceiling assemblies, and a findings letter. The letter identified the probable contributing mechanisms and gave ownership corrective options to choose from.
Project Details
- Project Type: Condensation & Moisture Assessment – Existing Self-Storage Building
- Location: Lake Forest, CA (Orange County)
- Climate Zone: California Energy Commission Climate Zone 8
- Building Size: Three stories, approx. 27,000 SF per floor
- Services: Mechanical Engineering, Moisture & Ventilation Assessment
- Client: Commercial Property Owner – Self-Storage Facility
- Status: Assessment Complete
Engineering Scope
Site Investigation
Our field work covered:
- Verification of the eight roof-mounted exhaust fans and wall louver intakes
- A survey of ceiling insulation at every floor level
- Documentation of active drip locations, deck corrosion, and floor staining
- A review of fan controls and the current operating schedule
Design Document Review
We compared field conditions against the original drawings, including:
- Architectural building sections and roof assembly details
- Mechanical plans and the exhaust fan schedule
- Insulation specifications and general notes
Key Findings
- The third-floor ceiling is bare corrugated metal roof deck with no interior insulation or vapor retarder. The two lower levels both have insulation at their ceilings.
- Stored units now block the original wall louver makeup-air path. As a result, the exhaust fans pull air through the elevator shaft, which disrupts elevator operation and has forced the fans onto a limited overnight schedule.
- A continuous gap between the partition walls and the roof deck lets moist air move freely across the floor.
Recommendations
We presented two corrective measures:
- Option 1: Restore the makeup-air path with new gravity ventilators. This is a low-cost, low-disruption fix that is also expected to resolve the elevator pressure issue.
- Option 2: Add insulation with an interior vapor retarder across the third-floor ceiling. This is a more comprehensive but higher-cost scope.
We recommended a phased approach: implement Option 1 first, then monitor the space before committing to Option 2.