Civil · MEP · Structural 2102 Business Center Drive, Suite 130, Irvine, CA 92612 Mon to Fri, 8am to 6pm (949) 482-7835
Industrial / Rialto, CA

Industrial development civil, structural, MEP and traffic engineering in Rialto, CA

Project overview.

Civil, structural, MEP and traffic engineering for a new industrial development in Rialto, in San Bernardino County.

The site is about 1.05 acres in the Renaissance Specific Plan area. The project adds two buildings beside an existing office: a 12,064 sq ft manufacturing workshop with a mezzanine, and a 4,476 sq ft multi-tenant industrial building with two suites, built as a shell. Both new buildings are concrete masonry with a steel structure, Type III-B construction, with fire sprinklers.

The civil engineering went to the City of Rialto as four packages: the on-site precise grading plan, the off-site street and water improvement plans, the final drainage study and the final water quality management plan (WQMP). The street frontage work reconfigures the driveway approaches, and the approach layout was revised to answer Fire Department access comments.

The development also includes paving, striping and 25 parking stalls, a new transformer with the existing overhead power lines moved underground, and an on-site wastewater treatment system in place of the old septic systems.

The firm also provided the structural engineering, the MEP engineering and the traffic engineering for the development.

3D view of a new industrial development with a large workshop, a smaller two-suite building, parking and a fenced yard

Project details

Location
Rialto, CA
Sector
Industrial
Project type
New manufacturing workshop and multi-tenant industrial building
Services
Civil, Structural, MEP
Jurisdiction
City of Rialto
Site
About 1.05 acres in the Renaissance Specific Plan area
Buildings
New 12,064 sq ft workshop and 4,476 sq ft two-suite building
Construction
Concrete masonry with a steel structure, Type III-B, sprinklered
Scope of work

Engineering scope.

Civil

  • On-site precise grading plan
  • Off-site street and water improvement plans
  • Final drainage study
  • Final water quality management plan (WQMP)
  • Driveway approach layout revised for Fire Department access
  • Plan check responses and resubmittals to the City

Structural

  • Structural engineering for the two new buildings
  • Concrete masonry walls with a steel structure

MEP

  • MEP engineering for the new buildings
  • Electrical service coordination with the utility for the new transformer

Traffic

  • Traffic engineering for the development
Photos

Project photos.

Planning something similar?

Send the plans and the address. We reply with a written scope, fee and schedule.