Street improvement and driveway approach plan in Los Angeles, CA
Project overview.
Civil engineering for the street improvement plan of an eight-lot residential development in the Mid-City area of Los Angeles.
The site is a triangular lot at the end of a residential street, where the street stops at a hammerhead turnaround. The driveway meets the street at that turnaround, so the plan details a non-standard driveway approach in the public right-of-way.
The existing driveway approach is removed and closed with new curb. The new approach sits at the turnaround, and the gutter is extended around the curve so that street drainage keeps flowing along the gutter line past the driveway.
The plan is drawn on the site topographic survey. It shows existing ground, top of curb and flow line elevations, the limits of sawcut and pavement replacement, the tie-in to the existing sidewalk, and two typical driveway sections drawn to City of Los Angeles Bureau of Engineering standard plans. The existing water meter and sewer manhole are called out to be protected in place.

Project details
- Location
- Los Angeles, CA
- Sector
- Residential
- Project type
- Eight-lot residential development, driveway in the public right-of-way
- Services
- Civil
- Jurisdiction
- City of Los Angeles
- Site
- Eight homes on eight lots at the end of a residential street
- Plan
- Street improvement plan with typical driveway sections
Engineering scope.
Civil
- Street improvement plan for the public right-of-way
- Non-standard driveway approach layout
- Curb and gutter removal and replacement
- Flow line grades that keep street drainage in the gutter
- Pavement sawcut and replacement limits
- Typical driveway sections and construction notes
- Existing utilities called out to be protected in place
Planning something similar?
Send the plans and the address. We reply with a written scope, fee and schedule.