SWPPP preparation.
Stormwater pollution prevention plans and erosion control plans for California construction sites, prepared with the grading plan.
The stormwater plan your site needs before it breaks ground.
A stormwater pollution prevention plan, or SWPPP, describes how a construction site keeps sediment and pollutants out of the storm drain while the ground is open. In California, sites that disturb one acre or more, or that are part of a larger common plan of development, need coverage under the statewide Construction General Permit, and a SWPPP is part of that coverage.
Smaller sites usually do not need the state permit, but the city still asks for an erosion and sediment control plan with the grading plan. We prepare both, and we prepare them with the grading plan so the measures on paper match the site.
Our office is in Irvine. Civil engineering is available throughout California and in Nevada. Our team travels to the site when the project needs it.
- SWPPP document for the Construction General Permit
- Site map with best management practices
- Erosion and sediment control plan
- Risk level determination
- Coordination with the grading plan
- Updates when the site plan changes
What the SWPPP covers.
The site
- Disturbed area and drainage patterns
- Discharge points and receiving waters
- Construction schedule and phasing
- Risk level
Best management practices
- Erosion control on slopes and open ground
- Sediment control at the perimeter and inlets
- Construction entrance and tracking control
- Material storage and waste handling
Records
- Site map and details
- Inspection and monitoring requirements
- Responsible parties on the site
- Amendments during construction
Sites that need a stormwater plan.
Sites of one acre or more
Coverage under the Construction General Permit, with a SWPPP.
Smaller sites
An erosion and sediment control plan with the grading plan, as the city requires.
Phased developments
Lots that are part of a larger common plan of development.
What to send for a proposal.
We review the scope and reply with a written fee proposal and schedule.
Request a proposal- Project address or parcel number
- Site plan or survey, if available
- Scope: grading, drainage, utilities, mapping or stormwater
- Soils report, if one exists
- Target submittal date
SWPPP preparation FAQ.
What is a SWPPP?
A stormwater pollution prevention plan. It identifies where pollutants could leave a construction site in stormwater and the measures that will be used to prevent it.
When is a SWPPP required in California?
When construction disturbs one acre or more of soil, or less than one acre as part of a larger common plan of development. Those sites need coverage under the statewide Construction General Permit.
Who prepares the SWPPP?
The Construction General Permit requires the SWPPP to be developed by a Qualified SWPPP Developer. Our proposal states who prepares and signs the document, and it is prepared together with the grading plan.
Do you perform the site inspections?
Inspections and monitoring during construction are a separate service, typically arranged by the contractor or the owner. Our proposal states what is included.
Is an erosion control plan the same thing?
No. An erosion control plan is a drawing in the grading set. A SWPPP is a separate document required for sites covered by the state permit. Many small sites need only the erosion control plan.
Ready to send the plans?
Share the drawings and the project address. Fee and schedule are quoted per project after review.