Civil · MEP · Structural 2102 Business Center Drive, Suite 130, Irvine, CA 92612 Mon to Fri, 8am to 6pm (949) 482-7835
ELECTRICAL · EV CHARGING

EV charging station design.

Load calculations and electrical permit plans for electric vehicle charging at commercial, multifamily and fleet sites.

4.8 from 19 Google reviews
Not ready to send plans?

Start with a free project review.

Leave your name and email. We reach out, look at what you have and tell you which engineering the project needs.

A project review is a scoping conversation. It is not engineering advice, and no design work begins until a proposal is signed.

A capacity question first.

Adding electric vehicle chargers is an electrical capacity question first. The existing service may carry a few Level 2 chargers, or it may need a new panel, a load management system or a larger service from the utility. The answer sets the cost and the schedule.

We prepare the load calculations and the electrical plans for EV charging and coordinate the utility service request. When the project includes new parking stalls or trenching across the site, our civil team prepares the site plan.

Our office is in Irvine. MEP engineering is available throughout California and in all 50 states. Our team travels to the site when the project needs it.

What we deliver
  • Existing service and load evaluation
  • Electrical load calculations
  • Single-line diagram and panel schedules
  • Charger layout, conduit and trenching plan
  • Load management design where the service is limited
  • Utility service upgrade coordination
"Excellent work. Honest, communicative, and professional."
Susan McMartinGoogle review
Scope

What the EV charging scope covers.

Level 2 charging

  • Multifamily and workplace parking
  • Retail and hospitality parking
  • Shared circuits with load management
  • Conduit for future chargers

DC fast charging

  • Dedicated service and switchgear
  • Transformer and pad coordination
  • Site layout and equipment clearances
  • Structural design for equipment pads and canopies

Code requirements

  • EV capable and EV ready spaces in new construction
  • Accessible charging spaces
  • Local reach code requirements
  • Title 24 forms when lighting is added
Project types

Sites we prepare EV charging plans for.

Existing parking lots and garages

Chargers added to an operating property.

New construction

EV capable and EV ready spaces required by code.

Fleet and depot charging

Higher loads on a set charging schedule.

Get started

What to send for a proposal.

We review the scope and reply with a written fee proposal and schedule.

Request a proposal
  • Project address and building type
  • Square footage and number of stories
  • Scope: mechanical, electrical, plumbing or all three
  • Architectural plans in PDF, if available
  • Target submittal date
Common questions

EV charging station design FAQ.

Will the existing electrical service support EV chargers?

We answer that with a load calculation based on the existing service and the recorded demand. If capacity is short, the options are load management, a panel upgrade or a new utility service.

What is load management?

A control system that limits the total charging load so more chargers can share the available capacity. The electrical code permits it, and it can avoid or reduce a service upgrade.

Do you handle the utility application?

We prepare the load information and drawings the utility asks for and coordinate with its planner. The owner signs the application as the customer.

Are accessible EV spaces required?

Yes. The California Building Code sets the number and the dimensions of accessible charging spaces. The stall layout is coordinated with the architect or our civil team.

Do you design solar with the chargers?

Yes. We provide solar PV electrical design when the project includes it.

Ready to send the plans?

Share the drawings and the project address. Fee and schedule are quoted per project after review.