Electrical load calculations.
Load calculations, panel schedules and single-line diagrams for service upgrades, EV charging, tenant improvements and added equipment.
Proof that the service can carry the load.
When a project adds electrical load, the building department and the utility want to know whether the existing service and panels can carry it. An electrical load calculation answers that question, following the method in the electrical code, and it is usually submitted with a panel schedule and a single-line diagram.
We prepare these documents for contractors, electricians and designers, either as a stand-alone electrical scope or as part of a full MEP set. When the calculation shows the service is too small, we design the upgrade.
Recent electrical scope includes the load analysis, panel schedules and single-line diagram for a new VRF system at a bank branch in Los Angeles, a new single-line diagram and panel schedules for a commercial kitchen in San Diego, and a new service and panel for a freestanding restroom building in Irvine.
Our office is in Irvine. MEP engineering is available throughout California and in all 50 states. Our team travels to the site when the project needs it.
- Electrical load calculation
- Panel schedules
- Single-line diagram
- Service and feeder sizing
- Power plans for new equipment, when required
- Plan check responses on our scope
When a load calculation is needed.
Added loads
- EV chargers
- New HVAC or kitchen equipment
- ADUs and additions
- Solar and battery systems
Service work
- Panel and service upgrades
- New subpanels and feeders
- Meter and main changes
- Coordination with the utility
Permits and corrections
- Tenant improvements
- Legalization of existing electrical work
- Change of use
- Correction notices asking for calculations
Projects we prepare electrical documents for.
Commercial suites
Tenant improvements and equipment changes.
Industrial buildings
New equipment, HVAC upgrades and service changes.
Homes and ADUs
Added units, EV chargers and panel upgrades.
Site electrical
Gates, lighting, signs and other site loads.
What to send for a proposal.
We review the scope and reply with a written fee proposal and schedule.
Request a proposal- Project address and building type
- Square footage and number of stories
- Scope: mechanical, electrical, plumbing or all three
- Architectural plans in PDF, if available
- Target submittal date
Electrical load calculations FAQ.
What is an electrical load calculation?
A calculation of the total electrical demand on a service or a panel, following the method in the electrical code. It shows whether the existing equipment can carry the planned loads.
When does a permit need one?
Commonly when load is added: EV chargers, new HVAC or kitchen equipment, an ADU, or a tenant improvement. The building department or the utility asks for it.
What is a single-line diagram?
A simplified drawing of the electrical system from the utility service to the panels and major equipment, showing sizes and ratings.
Can you provide only the electrical scope?
Yes. Electrical can be provided on its own or with mechanical and plumbing.
Do you work outside California?
Yes. MEP engineering is available in all 50 states.
Ready to send the plans?
Share the drawings and the project address. Fee and schedule are quoted per project after review.