Erosion control plans.
Erosion and sediment control plans for grading and building permits, prepared with the grading plan so the measures fit the site.
4.8 from 19 Google reviewsThe sheet the grading permit waits for.
California cities and counties generally will not issue a grading permit without an erosion and sediment control plan. The plan shows how the contractor keeps soil on the site and out of the street and the storm drain while the ground is open, and the inspector checks it again in the field.
We prepare the erosion control plan as a sheet in the grading set. For sites of one acre or more we also prepare the SWPPP the state permit requires, so the two documents show the same measures.
Our office is in Irvine. Civil engineering is available throughout California and in Nevada and Montana. Our team travels to the site when the project needs it.
- Erosion and sediment control plan sheet
- Best management practice details and notes
- Stabilized construction entrance and perimeter controls
- Inlet protection for nearby storm drains
- Agency standard notes
- Plan check responses on our scope
"They were very easy to work with."
What the erosion control plan shows.
Erosion control
- Slope protection
- Temporary cover for open ground
- Run-on diversion
- Final stabilization notes
Sediment control
- Fiber rolls and silt fence
- Gravel bag barriers
- Storm drain inlet protection
- Sediment traps where the site needs them
Site management
- Stabilized construction entrance
- Concrete washout
- Material and stockpile areas
- Wet season requirements
Sites we prepare erosion control plans for.
Residential lots
New homes, additions and ADUs with grading.
Hillside sites
Slopes where runoff control is reviewed closely.
Commercial sites
Sites under one acre, and larger sites together with a SWPPP.
What to send for a proposal.
We review the scope and reply with a written fee proposal and schedule.
Request a proposal- Project address or parcel number
- Site plan or survey, if available
- Scope: grading, drainage, utilities, mapping or stormwater
- Soils report, if one exists
- Target submittal date
Erosion control plans FAQ.
When is an erosion control plan required?
Agencies generally require one with a grading permit, and many require erosion control notes on building permits that disturb soil. The rule is local, so we confirm it with the agency.
Is an erosion control plan the same as a SWPPP?
No. The erosion control plan is a drawing in the grading set. A SWPPP is a separate document required for sites covered by the statewide Construction General Permit, generally one acre or more of disturbance.
Who prepares it?
We prepare it with the grading plan, as part of the civil set.
Do the requirements change in the wet season?
Yes. Agencies set wet season dates and require the measures to be in place before them. The dates and the notes vary by agency.
Do you inspect the site during construction?
Site inspections are a separate service, usually arranged by the contractor or the owner. Our proposal states what is included.
Ready to send the plans?
Share the drawings and the project address. Fee and schedule are quoted per project after review.