Fire sprinkler and fire alarm design.
Fire sprinkler and fire alarm drawings for new buildings and tenant improvements, coordinated with the ceilings, ducts and lighting in the MEP set.
4.8 from 19 Google reviewsWhen the layout changes, the fire systems change with it.
When a layout changes, the fire sprinklers and the fire alarm devices usually have to change with it. New walls block sprinkler coverage, new rooms need notification devices, and a change of use can move the space into a different hazard classification.
We prepare fire sprinkler and fire alarm drawings with the MEP set, so ceilings, ducts, lights and sprinkler heads are coordinated before the contractor is on site. The drawings are prepared for review by the building department and the fire authority that serve the project.
Our office is in Irvine. MEP engineering is available throughout California and in all 50 states. Our team travels to the site when the project needs it.
- Fire sprinkler layout and pipe sizing
- Hydraulic calculations
- Fire alarm device layout and riser diagram
- Voltage drop and battery calculations
- Coordination with ceilings, ducts and lighting
- Plan check responses on our scope
"Solid, professional collaborators."
What the fire protection scope covers.
Fire sprinklers
- New systems for new buildings
- Relocated and added heads for tenant improvements
- Hydraulic calculations from flow test data
- Residential systems for homes and ADUs, where required
Fire alarm
- Device layout for the new floor plan
- Panel and power supply sizing
- Sequence of operation
- Interface with hood suppression, elevators and HVAC shutdown
Coordination
- Ceiling and soffit conflicts
- Storage height and commodity questions
- Water supply and backflow requirements
- Deferred submittal packages
Projects we prepare fire protection drawings for.
Tenant improvements
Sprinkler and alarm changes for a new layout in an existing suite.
New buildings
Complete systems designed with the MEP set.
Change of use
A check of whether the existing system fits the new occupancy.
What to send for a proposal.
We review the scope and reply with a written fee proposal and schedule.
Request a proposal- Project address and building type
- Square footage and number of stories
- Scope: mechanical, electrical, plumbing or all three
- Architectural plans in PDF, if available
- Target submittal date
Fire sprinkler and fire alarm design FAQ.
Which standards do you design to?
Fire sprinkler systems are designed to NFPA 13, 13R or 13D, depending on the building, and fire alarm systems to NFPA 72, each as adopted and amended by the state and the local fire authority.
Is the fire sprinkler design a deferred submittal?
Many jurisdictions allow it to be deferred, and many contractors prepare their own shop drawings. Owners and architects ask us for the design when they want it coordinated with the MEP set or priced by more than one contractor.
Do you need a water flow test?
Hydraulic calculations need current water supply data. If a recent flow test is not available, the owner or the contractor requests one from the water agency.
Do you install or test the systems?
No. We provide design. Installation, testing and certification are performed by licensed fire protection and fire alarm contractors.
Can a small tenant improvement skip fire alarm drawings?
That is decided by the fire authority. Some accept a short scope description for minor changes. We confirm what the reviewer expects before we start.
Ready to send the plans?
Share the drawings and the project address. Fee and schedule are quoted per project after review.