Civil · MEP · Structural 2102 Business Center Drive, Suite 130, Irvine, CA 92612 Mon to Fri, 8am to 6pm (949) 482-7835
MEP · RESTAURANTS

Restaurant MEP engineering.

Mechanical, electrical and plumbing design for restaurants, cafes and commercial kitchens, coordinated with the kitchen equipment plan and the health department submittal.

4.8 from 19 Google reviews
Not ready to send plans?

Start with a free project review.

Leave your name and email. We reach out, look at what you have and tell you which engineering the project needs.

A project review is a scoping conversation. It is not engineering advice, and no design work begins until a proposal is signed.

The kitchen drives the engineering.

A restaurant puts more load on a suite than almost any other tenant. The cooking line needs hood exhaust and makeup air, the equipment needs gas and power the existing service may not have, and the plumbing has to carry grease waste to an interceptor the sewer agency will accept.

We design the mechanical, electrical and plumbing systems from the kitchen equipment plan, so the drawings the building department and the health department review show the same equipment. Restaurant work shown on this site includes a restaurant tenant improvement in Costa Mesa, a commercial kitchen tenant improvement in San Diego and a gelato shop in Los Angeles.

Our office is in Irvine. MEP engineering is available throughout California and in all 50 states. Our team travels to the site when the project needs it.

What we deliver
  • Kitchen hood exhaust and makeup air design
  • HVAC for dining and back-of-house areas
  • Grease waste, grease interceptor and gas piping design
  • Electrical plans, panel schedules and load calculations
  • Title 24 energy compliance forms
  • Plan check responses on our scope
"Communication was clear and responsive, revisions were turned around quickly."
Steven CortesGoogle review
Scope

What the restaurant scope covers.

Mechanical

  • Type I and Type II hood exhaust
  • Makeup air and air balance
  • Dining room heating and cooling
  • Walk-in cooler and refrigeration coordination

Plumbing

  • Grease waste and interceptor sizing
  • Gas piping and meter load
  • Water heater sizing for the fixture schedule
  • Floor sinks, hand sinks and indirect waste

Electrical

  • Kitchen equipment circuits
  • Service and panel capacity check
  • Lighting and controls
  • Hood suppression and fire alarm interlocks
Project types

Restaurant projects we engineer.

New restaurant in an existing suite

A full MEP set for a first-generation or second-generation space.

Kitchen remodels and equipment changes

New hoods, added cooking equipment or a larger grease interceptor.

Cafes, bakeries and dessert shops

Lighter cooking loads with the same health department review.

Get started

What to send for a proposal.

We review the scope and reply with a written fee proposal and schedule.

Request a proposal
  • Project address and building type
  • Square footage and number of stories
  • Scope: mechanical, electrical, plumbing or all three
  • Architectural plans in PDF, if available
  • Target submittal date
Common questions

Restaurant MEP engineering FAQ.

Do you work from the kitchen designer's equipment plan?

Yes. The equipment schedule sets the hood, gas, power and plumbing loads, so we start from it. If the equipment changes during design, the MEP drawings are updated as described in our agreement.

Does the existing suite have enough power and gas for a restaurant?

Often it does not. We check the existing electrical service, gas meter and rooftop capacity at the start of design, so an upgrade is known early.

Who sizes the grease interceptor?

We size it with the plumbing design, using the plumbing code and the requirements of the local sewer agency, which can be stricter than the code.

Do you handle the health department submittal?

We prepare the MEP drawings the health department reviews and respond to comments on our scope. The application itself is usually filed by the owner, the architect or the kitchen designer.

Is Title 24 required for a restaurant tenant improvement?

In California, yes, when the work alters lighting, mechanical systems or water heating. We prepare the compliance forms with the MEP set.

Ready to send the plans?

Share the drawings and the project address. Fee and schedule are quoted per project after review.