Senate Bill 9 lets the owner of a lot zoned for single-family use, in an urbanized area, split it into two lots through a ministerial approval, without a public hearing, when the lot and the project meet the conditions in the statute. The lot split rules are in Government Code Section 66411.7.
This guide covers the size limits, the owner occupancy rule, what a city may and may not require, the sites that are excluded, the review time, and the engineering that goes with the application. It follows the fact sheet of the California Department of Housing and Community Development (HCD) dated April 2026 and the other sources listed at the end, checked on November 23, 2026. It is general information, not legal advice.
The numbers
- Two lots. One lot becomes two lots of roughly equal size.
- The 40 percent rule. Neither new lot may be smaller than 40 percent of the original lot.
- 1,200 square feet. Each new lot is at least 1,200 square feet, and local standards cannot prevent the creation of two 1,200 square foot lots. A local agency may adopt a smaller minimum.
- Two units per lot. Up to two units can be built on each new lot.
- Units of 800 square feet. Local standards cannot prevent one or two units of at least 800 square feet each on a qualifying lot.
The two size rules work together. A 2,400 square foot lot can be split evenly. A 60 to 40 split needs at least 3,000 square feet, because 40 percent of 3,000 is 1,200. On a 7,500 square foot lot, the smaller parcel has to be at least 3,000 square feet.
Conditions on the owner and the lot
- Owner occupancy. The applicant signs an affidavit stating an intent to live in one of the units as a principal residence for at least three years from the approval of the lot split. Community land trusts and qualified nonprofits are not subject to it.
- One time only. A parcel created by an SB 9 lot split cannot be split again under SB 9.
- Not next door. A lot is not eligible if the adjacent lot was split under SB 9 by the same owner, or by someone acting in concert with that owner.
- No short-term rentals. Rental units created through the process have to be rented for terms longer than 30 days.
What a city may require
- Easements for public services and utilities.
- That each parcel has access to, or adjoins, the public right-of-way.
- Objective zoning, subdivision and design standards, where they apply uniformly in the underlying zone.
- Side and rear setbacks of up to four feet, except where an existing structure already sits closer.
- Up to one off-street parking space per unit, and none where the parcel is within a half mile walking distance of a high-quality transit corridor or a major transit stop, or within one block of a car-share vehicle.
What a city may not require
- Dedications of right-of-way.
- The construction of off-site improvements.
- The correction of nonconforming zoning conditions.
- Standards unrelated to the design or improvement of a parcel.
HCD's technical assistance letters, summarized in the same fact sheet, add detail. In March 2025 HCD told one city that neighborhood noticing cannot be a condition of approval for an urban lot split. In July 2024 it told another that park dedication in-lieu fees cannot be required as a condition of approval.
Sites that do not qualify
- Projects that would demolish or alter housing that is rent-restricted by covenant or law, under rent control, or occupied by a tenant in the last three years.
- Parcels where units were withdrawn from the rental market under the Ellis Act in the last 15 years.
- Historic landmarks, and contributing structures in historic districts.
- Specified environmentally sensitive, hazardous or protected lands, such as wetlands and prime farmland, as listed in the statute.
Review time and grounds for denial
The city has 30 days to decide whether the application is complete, and 60 days from a complete application to approve or deny it. A city may deny an SB 9 application only where the lot split or the development would have a specific adverse impact on public health and safety or the physical environment that cannot be mitigated.
Two later bills changed the rules. Senate Bill 450, in 2024, limited the standards local governments can apply to SB 9 projects. Assembly Bill 1061, in 2025, clarified the exclusions for historic districts and landmarks. A city handout written before those bills may be out of date.
The engineering behind the application
The statute decides whether the lot qualifies. The drawings show that the two lots work. Each city publishes its own application checklist, and most ask for the same things:
- The parcel map. A tentative map and then a final map, prepared by a licensed land surveyor.
- A site plan for both lots. Lot lines, lot areas checked against the 40 percent and 1,200 square foot limits, buildings and setbacks.
- Access. How each lot reaches the street, including a driveway or access easement for a rear lot, and fire access.
- Utilities. Separate water, sewer and storm drain service for each lot, and the easements they need.
- Grading and drainage. How each lot drains without sending water across the new lot line.
The access and utility items are the ones the statute expressly lets a city require, so the civil plans have to show them clearly for both lots.
Common questions
What is the minimum lot size for an SB 9 lot split?
Each new lot has to be at least 1,200 square feet and at least 40 percent of the original lot, so the original lot has to be at least 2,400 square feet unless the city has adopted a smaller minimum.
Do I have to live on the property?
The applicant signs an affidavit stating an intent to occupy one of the units as a principal residence for at least three years from the approval of the lot split.
How many units can be built after an SB 9 lot split?
Up to two units on each of the two new lots.
How long does the city have to act?
Sixty days from a complete application.
Can the city require street improvements?
No. A city may not require right-of-way dedications or the construction of off-site improvements for an urban lot split.
Who prepares the parcel map?
A licensed land surveyor. The civil engineering plans are prepared alongside it.
How we help
We prepare the civil engineering for SB 9 lot splits: the site plan for both lots, the grading and drainage plan, the utility plan and the access layout, and we coordinate with the land surveyor who prepares the parcel map. We can bring in a surveyor we have worked with, or work with yours.
Sources
Checked November 23, 2026. This article is general information, not legal advice and not advice for a specific property. The law has been amended several times, and each city applies its own objective standards, so confirm the current rules with the planning department and read the statute.
- California Department of Housing and Community Development, Housing Law Fact Sheet, Duplexes and Lot Splits (SB 9), April 2026
- California Department of Housing and Community Development, SB 9 Fact Sheet, September 2024
- Los Angeles County Department of Regional Planning, SB 9 summary
- Southern California Association of Governments, Senate Bill 9: Ministerial Approval of Duplexes and Urban Lot Splits