Who Can Stamp Plans in California? Engineers, Architects and Limits

Wood framing of a custom home under construction in Altadena

In California, building plans are prepared, signed and stamped by a licensed architect or a licensed civil or structural engineer, except for a short list of exempt buildings that an unlicensed person may design. A stamp can only go on work the licensee prepared, or work prepared under that licensee's responsible charge.

This guide covers who may design what, the exemptions for unlicensed designers, the rules for mechanical and electrical work, and what a stamp means. It is drawn from publications of the state licensing boards, listed at the end and checked on November 23, 2026. It is general information, not legal advice.

Who may design what

The Board for Professional Engineers, Land Surveyors, and Geologists and the California Architects Board publish the same summary:

WhoMay design
Structural engineersAny building of any type.
Civil engineersAny building except public schools and hospitals.
ArchitectsAny building except the structural portion of a hospital.
Unlicensed personsOnly the exempt buildings and non-structural work listed below.

Structural engineering is a title authority within civil engineering: a structural engineer is a civil engineer who also holds the structural title. Public schools are regulated by the Division of the State Architect, and hospitals by the Department of Health Care Access and Information.

What an unlicensed person may design

Under Business and Professions Code Sections 5537 and 6737.1, an unlicensed person may prepare plans for:

  • Single-family dwellings of wood-frame construction, no more than two stories and a basement.
  • Multiple dwellings of no more than four units, of wood-frame construction, no more than two stories and a basement, with no more than four units on a lot.
  • Garages and other structures appurtenant to those dwellings, of wood-frame construction, no more than two stories and a basement.
  • Agricultural and ranch buildings of wood-frame construction, unless the building official finds an undue risk to public health, safety or welfare.

There is a condition, and it is the reason an exempt house can still need an engineer. The building has to follow the conventional wood-frame requirements of the building code. If any portion does not, the building official must require the plans, calculations and specifications for that portion to be prepared, signed and sealed by a licensed engineer or architect.

Interior work and tenant improvements

An unlicensed person may also design storefronts, interior alterations or additions, fixtures, cabinetwork, furniture and equipment, and the alterations needed to install them, as long as the work does not affect the structural safety of the building.

Cities apply this narrowly. The City of Sacramento, in a handout revised January 1, 2026, accepts commercial tenant improvement plans from an unlicensed person only where the space needs one exit, is a Group B or M occupancy, needs no fire walls or fire barriers, is not being converted from residential use or changed to a higher hazard, is not in a historic building, and does not need energy, mechanical, electrical or plumbing systems designed by licensed professionals or contractors. Even then, the building official may require a licensed professional.

Mechanical, electrical and plumbing design

  • Engineers. Civil, electrical and mechanical engineering are practice acts. Only a person licensed in that discipline may practice or offer to practice it.
  • Contractors. Under Section 6737.3, a licensed contractor may design the electrical or mechanical systems it will install itself. The exemption does not cover designing work for another contractor to install.
  • Local thresholds. Cities decide when engineered drawings are needed for plan check. The City of Calabasas, for example, requires electrical plans to be prepared and stamped by a registered design professional or a licensed electrical contractor where the service equipment is 400 amperes or larger.

What the stamp means

The stamp is tied to responsible charge. Under Business and Professions Code Section 6703 and the Board's Rule 404.1, the engineer in responsible charge makes the engineering decisions, or reviews and approves them. The Board's guide for local officials states that the term does not refer to management, hierarchy or financial liability.

  • Final documents. Final civil, electrical and mechanical engineering documents carry the engineer's seal, signature and the date of signing. On plans, they appear on every sheet. On calculations, specifications and reports, they appear on the title page.
  • What the seal shows. The licensee's name, license number and branch.
  • Drafts. Interim documents do not have to be sealed, but they show the engineer's name and license number and a note such as "not for construction".
  • Electronic seals. Electronic signatures and seals are allowed. A local agency may still ask for wet stamps or signatures.

Can an engineer stamp drawings someone else prepared?

Only when the work was done under that engineer's responsible charge. The Board's guide is direct on two points: only a licensed engineer may seal engineering documents, and an unlicensed person cannot sign for a licensed person.

A second engineer can take over a project. The Board calls this a successor licensee. The successor has to exercise the same control and review as on any other work, and is responsible for the new work and its effect on what was already designed. The original engineer stays responsible for the documents that carry only the original stamp.

This is why an engineer asked to seal drawings that are already drawn will review the design, run the calculations and change what does not work before signing. Read against the Board's definition, a request to stamp finished drawings without the engineer's own review does not fit responsible charge.

What this means on a project

  • For designers. An exempt house can still need engineering for the portions outside conventional framing. Bring the engineer in while the layout can still change.
  • For contractors. The design exemption covers the electrical and mechanical systems you install yourself. It does not cover civil engineering, and it does not replace engineered plans where the city requires them.
  • For architects. An architect may design any building other than the structural portion of a hospital. Where engineers prepare the structural, civil or MEP parts of the set, each engineer in responsible charge signs and seals that work.

Common questions

Can an unlicensed designer draw house plans in California?

Yes, for a wood-frame single-family dwelling of no more than two stories and a basement that follows conventional framing. Portions outside conventional framing have to be designed and stamped by a licensed engineer or architect.

Can a civil engineer design a building?

Yes. A civil engineer may design any building except public schools and hospitals.

Does a tenant improvement need an engineer's stamp?

It depends on the work and the city. Non-structural interior alterations can be exempt, but structural changes are not, and many cities require engineered mechanical, electrical and plumbing plans.

Can a contractor design the electrical system?

A licensed contractor may design the electrical or mechanical systems it will install itself, under Section 6737.3.

Does every sheet need a stamp?

On final engineering plans, the seal, signature and date appear on each sheet.

Can a building official ask for a stamp on an exempt building?

Yes. The official must require one for any portion outside conventional framing, and local agencies may adopt their own requirements.

How we help

YA Creative Design Partners provides structural, civil and MEP engineering for architects and designers and for contractors, from the start of design through plan check. The firm is licensed and insured. See structural engineering, MEP engineering and civil engineering.

Sources

Checked November 23, 2026. This article is general information, not legal advice and not advice for a specific project. Licensing rules change, and building departments apply their own requirements, so confirm them with the licensing boards and with the building department that will review your plans.