In a California tenant improvement, the Title 24 lighting requirements apply when the work alters 10 percent or more of the existing luminaires serving an enclosed space. The altered lighting then has to stay within a lighting power limit, and it has to carry the lighting controls that go with the compliance option the designer chooses.

This guide covers the trigger, the three compliance options, the controls each one calls for, and the forms that go with the plans. It applies to nonresidential spaces under the 2025 Energy Code, which governs building permit applications submitted on or after January 1, 2026. It was checked on November 23, 2026 against the California Energy Commission sources listed at the end.

When a tenant improvement triggers the lighting rules

The Energy Code treats lighting work in an existing space as an alteration. The rules for altered indoor lighting are in Section 141.0(b)2I, and they apply space by space.

  • Triggered. Alterations that include 10 percent or more of the existing luminaires serving an enclosed space.
  • Not triggered. An enclosed space with a single luminaire. Work that only adds a lighting control, such as an occupancy sensor. One-for-one luminaire alterations of up to 50 luminaires per floor or per tenant space in a year.
  • Only what changes. The requirements fall on the altered components. Existing luminaires that are left alone are not held to the lighting power limits or to added controls.

A space that receives a lighting system for the first time is a different case. The Energy Commission's compliance manual treats it like new construction.

The three ways to comply

The code gives three options for altered lighting. Each pairs a lighting power limit with a set of controls. The more the power drops, the fewer controls are required.

OptionLighting powerControls required
1Altered lighting power does not exceed the allowance in Section 140.6.All the mandatory controls that apply to the space: manual, multilevel, shut-off, daylight responsive and demand responsive.
2Altered lighting power is no more than 80 percent of the allowance in Section 140.6.Manual and automatic shut-off controls. Multilevel, daylight responsive and demand responsive controls are not required.
3One-for-one luminaire alteration in a building or tenant space of 5,000 square feet or less, with the total wattage of the altered luminaires reduced by at least 40 percent.Manual and automatic shut-off controls. Multilevel, daylight responsive and demand responsive controls are not required.

Under options 2 and 3, occupant sensing shut-off is not required in offices larger than 250 square feet. The controls follow from the option, so the option is a design decision to make at the start, before the fixture schedule is set.

The mandatory controls, in plain terms

These are the five controls in Section 130.1 of the 2025 Energy Code, with the thresholds the Energy Commission's manual gives for each.

  • Manual controls. Each space has manual on and off controls that are readily accessible, or placed where the controlled lighting can be seen. Each type of lighting, such as general, display and decorative, is controlled separately.
  • Multilevel controls. For general lighting in enclosed spaces of 100 square feet or larger with a connected general lighting load above 0.5 watts per square foot. The lighting has to dim continuously from full output down to 10 percent or lower.
  • Shut-off controls. Lighting shuts off automatically by an occupant sensor, an automatic time switch or an equivalent control, with a separate control for each floor. Occupant sensing is required in offices of 250 square feet or smaller, multipurpose rooms under 1,000 square feet, classrooms, conference rooms and restrooms.
  • Daylight responsive controls. For general lighting in skylit and primary sidelit daylit zones with 75 watts or more of installed general lighting. The same threshold applies to secondary sidelit zones.
  • Demand responsive controls. For buildings with 4,000 watts or more of installed lighting power that are subject to the multilevel requirement. The controls have to be able to reduce total lighting power by 15 percent or more on a demand response signal.

Circuits and wiring

Rewiring counts. Alterations to lighting wiring are lighting alterations, and new or completely replaced lighting circuits have to meet the control separation requirements of the code. Alterations do not have to separate existing general, display or decorative lighting that already shares a circuit.

How the lighting power limit is set

The allowance in Section 140.6 is a budget in watts. The 2025 code leaves two prescriptive methods for setting it: the Complete Building Method and the Area Category Method. The Tailored Method was removed, and allowances for wall display, floor display and task lighting were added for several applications. The Area Category Method sets the allowance by the function of each area.

Forms and testing

  • With the plans. The certificate of compliance for indoor lighting, NRCC-LTI-E. It records the scope of work, including whether it is an altered lighting system, and the fixture schedule with the designed watts.
  • After installation. Acceptance tests for the installed controls: shut-off controls (NRCA-LTI-02-A), daylight responsive controls (NRCA-LTI-03-A) and demand responsive controls (NRCA-LTI-04-A). They are performed by a lighting controls acceptance test technician certified through a provider approved by the Energy Commission.
  • Small jobs. Acceptance testing is not required where the alteration adds controls to 20 or fewer luminaires across the whole project.

The acceptance test is a field test done after the controls are installed. It is separate from the design, and it is worth carrying in the construction schedule from the start.

Examples from our projects

On a hair salon tenant improvement in Arcadia, the electrical design covered the lighting, the receptacles and the equipment loads, and the energy compliance documentation went in with the plans for City of Arcadia plan check. On a restaurant tenant improvement in Costa Mesa, the lighting design was part of the electrical scope together with the panel schedules and the single-line diagram.

Common questions

Does replacing light fixtures require Title 24 compliance?

It does when the work alters 10 percent or more of the existing luminaires serving an enclosed space, unless one of the exceptions applies.

What is the 80 percent rule for lighting alterations?

If the altered lighting power is no more than 80 percent of the allowance in Section 140.6, only manual and automatic shut-off controls are required.

Are occupancy sensors required in a tenant improvement?

Automatic shut-off is part of every compliance option. Occupant sensing is specifically required in small offices, small multipurpose rooms, classrooms, conference rooms and restrooms.

Which form covers lighting for plan check?

NRCC-LTI-E, the certificate of compliance for indoor lighting.

Who performs lighting controls acceptance testing?

A certified lighting controls acceptance test technician. It is a separate role from preparing the plans.

Which Energy Code applies to my project?

The 2025 Energy Code applies to permit applications submitted on or after January 1, 2026.

How we help

We prepare the lighting and electrical plans for tenant improvements together with the Title 24 compliance documents, as part of our electrical engineering scope. We prepare the compliance forms. Acceptance testing in the field is done by a certified acceptance test technician and is not part of our scope. Related reading: code-compliant electrical systems in California.

Sources

Checked November 23, 2026. This article is general information, not advice for a specific project. Requirements change over time, so confirm them with the building department that will review your plans.

Ready to send the plans?

Share the drawings and the project address. Fee and schedule are quoted per project after review.