A single-line diagram, also called a one-line diagram, is a drawing of a building's electrical distribution system from the utility service down to the panels and large equipment, in which one line stands for each set of conductors. It puts the sizes, ratings and protection of the whole system on one sheet, and plan check reads the electrical system from it.
This guide covers what the diagram shows, how to read it, when one is needed and what California building departments ask for. It was checked on November 23, 2026 against the city and county sources listed at the end.
How to read one
Read from the source to the loads, usually top to bottom:
- The utility. The transformer and the service conductors that bring power to the building.
- The service equipment. The meter and the main disconnect, with the service voltage and ampere rating.
- The distribution. Switchboards or distribution panels, and any transformers inside the building.
- The feeders. The conductors and conduits that run from the distribution equipment to each panel.
- The panels and large loads. Each subpanel, and equipment large enough to be fed on its own, such as rooftop units, kitchen equipment or EV chargers.
Every device on the path carries a label: a breaker or fuse size, a conductor size, a rating. If a label is missing, expect plan check to ask for it.
What plan check asks the diagram to show
The City of Calabasas publishes its list, dated March 2026 and written for the 2025 California Electrical Code. A single-line diagram there has to show:
- The maximum available fault current from the utility at each service-entrance section.
- All existing and proposed subpanels and their loads.
- The size and type of each breaker and fuse.
- The size and type of each conduit and feeder.
- The size and length of the service conductors, feeders and branch circuits, including equipment grounds, with voltage drop.
- The grounding and bonding conductors, with their sizes, for the service and for any separately derived system such as a transformer or generator.
- The service load calculation in amperes.
- New, relocated or re-fed equipment marked clearly, and unchanged equipment marked existing.
Other agencies ask for the same core. The City of Sacramento lists the main service size, the service entrance conduit and conductors, the overcurrent devices, the feeders, the interrupting ratings of the service and panelboards, and all the grounding conductor sizes. The County of Ventura asks for the serving voltage, the amperage and the short-circuit current available from the utility, and the interrupting capacity of the equipment.
Two numbers worth understanding
- Available fault current. The largest current the utility can deliver into a short circuit at the service. It comes from the utility, and the equipment has to be rated to interrupt it. That rating is the AIC, the ampere interrupting capacity, which is why agencies ask for both numbers on the same diagram.
- Voltage drop. Long feeders lose voltage. Agencies ask for conductor lengths on the diagram so the drop can be checked.
Single-line diagram, riser diagram, panel schedule
| Document | What it shows |
|---|---|
| Single-line diagram | The electrical path and the rating of everything on it: service, protection, feeders, panels. |
| Riser diagram | How the equipment is stacked and connected through the building. |
| Panel schedule | The circuits in one panel, with the load on each and the panel total. |
| Load calculation | Whether the service and feeders can carry the total load. |
They are not interchangeable. The City of Los Angeles correction list for electrical plan check, in its 2023 edition, asks applicants to provide a single-line diagram, not a riser diagram. The City's correction list also asks for the electrical rating of the transformers, buses, circuit breakers, panelboards and motors.
When a single-line diagram is needed
Whenever the electrical work goes to plan check. In Calabasas that means new commercial buildings, multifamily developments, single-family dwellings, any service or panelboard upgrade, and any panel of 400 amperes or more. Sacramento lists single-line drawings, load calculations and the Title 24 energy documents as the minimum for electrical plan check.
Calabasas also requires the plans to be prepared and stamped by a registered design professional or a licensed electrical contractor where the service equipment is 400 amperes or larger, or where the available fault current exceeds 10,000 amperes.
Examples from our projects
For a VRF replacement at a bank branch in Los Angeles, the electrical scope was the power supply design for the new equipment, the panel schedules and single-line diagram, and the load analysis. For a commercial kitchen in San Diego, the single-line diagram started at the 3,000-ampere building service and ran to a new kitchen subpanel.
Common questions
Is a one-line diagram the same as a single-line diagram?
Yes. The two names are used for the same drawing.
What is the difference between a single-line diagram and a riser diagram?
A single-line diagram carries the ratings and sizes of the electrical path. A riser diagram shows how the equipment connects through the building. Plan check asks for the first.
Does existing equipment have to be shown?
Yes. Agencies ask for existing and proposed equipment, with the existing equipment marked as existing.
What does AIC mean?
Ampere interrupting capacity: the fault current a breaker or panel is rated to interrupt.
Where does the available fault current come from?
From the utility that serves the building.
Is a single-line diagram needed for an EV charger?
City checklists for Level 2 and larger chargers ask for one, together with the load calculation.
How we help
We prepare single-line diagrams, panel schedules and electrical load calculations as part of our electrical engineering scope. Related reading: EV charger load calculations and code-compliant electrical systems in California.
Sources
Checked November 23, 2026. This article is general information, not advice for a specific project. Requirements differ by agency and change over time, so confirm them with the building department that will review your plans.
- City of Calabasas, Electrical Plan Check Submittal Requirements, March 2026
- City of Sacramento, Electrical Plan Check Requirements, form CDD-0212, revised January 1, 2023
- County of Ventura, Requirements for Construction Plans, Non-Residential
- City of Los Angeles, Electrical Plan Check Correction List, 2023 edition