LID Requirements in Los Angeles County

Bollards and a utility structure on a gravel surface beside planting at a commercial site

In unincorporated Los Angeles County, Low Impact Development (LID) rules ask a project to keep stormwater on its own site. What that means depends on the project: a small residential project that changes half or more of its hard surfaces installs two simple measures, and larger projects retain a calculated volume of runoff on site.

This guide sorts the requirements by project type, explains the design volume, and covers fire rebuilds. It follows the County's 2025 LID Standards Manual and handouts, listed at the end and checked on November 23, 2026. It applies to the unincorporated areas. Cities have their own programs.

The rule behind it

The requirements are in Chapter 12.84 of Title 12 of the Los Angeles County Code. The County revised its LID Standards Manual in 2025 to conform to the 2021 municipal stormwater permit issued by the Regional Water Board, and the 2025 manual replaces the 2014 edition. Some County handouts still in circulation were written under the older permit, so check which edition a checklist was written for.

Which category is the project in?

Category in the 2025 manualWhich projectsWhat it has to do
Small-scale residential, non-priorityFour units or fewer, with an addition or alteration of 50 percent or more of the existing impervious area.Install at least two measures from the manual's list.
Large-scale, non-priorityResidential projects of five or more units, and all non-residential projects, that are not priority projects.Retain the stormwater quality design volume on site.
Priority development projectsThe larger and higher-risk projects listed below.Retain 100 percent of the stormwater quality design volume on site, unless that is shown to be technically infeasible.

One group is exempt: a non-priority project on an existing developed site with four or fewer residential units that adds or alters less than 50 percent of the impervious surface.

Small residential projects: two measures

A house, a duplex or a small rebuild in this category picks at least two of the measures the manual lists. They include:

  • Porous pavement over at least 50 percent of the paved area.
  • A rain barrel or cistern of at least 200 gallons.
  • A rain garden of at least 200 gallons, with the downspouts directed to it.
  • A planter box of at least 200 gallons.
  • Disconnected impervious surfaces, so that roofs and paving drain onto planted areas.
  • A dry well sized to infiltrate 200 gallons within 96 hours.
  • Two 15-gallon drought-tolerant trees planted within 10 feet of impervious surfaces, with a weather-based irrigation controller.

The manual requires a geotechnical report, under the County's policy GS 200.1, where porous pavement or a dry well is used, so those two choices carry an extra report. The measures are shown on the site drainage or grading plan.

Priority development projects

The 2025 manual lists these as priority projects:

  • New development that disturbs one acre or more and adds more than 10,000 square feet of impervious area.
  • New industrial parks and commercial malls of 10,000 square feet or more.
  • New or redevelopment projects that create or replace 5,000 square feet or more of impervious area and include restaurants, parking lots, automotive service facilities or retail gasoline outlets.
  • Projects that create or replace 2,500 square feet or more of impervious area, could affect sensitive species or habitat, and are in, next to, or discharging directly to a Significant Ecological Area.
  • Redevelopment that creates or replaces 5,000 square feet or more of impervious area on an existing site with 10,000 square feet or more of impervious area.

Two points changed with the 2025 manual. It states that the 2021 permit no longer requires single-family hillside homes to be treated as priority projects. And street and road projects of 10,000 square feet or more of impervious area follow the U.S. EPA's green streets guidance to the maximum extent practicable.

The stormwater quality design volume

The number at the center of a larger project is the stormwater quality design volume, written SWQDv. It is the runoff from the greater of two storms: a 0.75-inch, 24-hour rain event, or the 85th percentile, 24-hour rain event from the County's isohyetal map. The County's HydroCalc tool is used to calculate it for sites up to 40 acres.

The project retains that volume on site through infiltration, bioretention, rainfall harvest and use, or a combination. Where retaining it is technically infeasible, the manual sets out alternative compliance.

The 50 percent rule for existing sites

Redevelopment is measured against the impervious area already there. If 50 percent or more of it is altered, the entire site has to comply. If less than 50 percent is altered, only the altered part does. Routine maintenance does not count.

Fire rebuilds

The County published a short handout for small residential fire rebuilds, of four units or fewer:

  • More than 50 percent. A rebuild that affects more than 50 percent of the existing impervious area makes the whole site comply.
  • Less than 50 percent. Exempt. The handout gives replacing a foundation in the same location, without adding impervious area, as an example.
  • Two measures. A rebuild that has to comply shows two measures on its site drainage or grading plan.
  • The covenant. Recording of the LID covenant can be deferred, and is required before the certificate of occupancy.

How it reaches the grading plan

LID is reviewed with the drainage and grading plan check. The plans show the proposed impervious area, the design storm, the design volume, the share retained on site and the measure used, and the owner records a maintenance covenant. Open facilities above ground are designed to drain within 48 hours and underground ones within 96 hours. See grading permits in Los Angeles County.

In a city instead of the County?

These rules apply in the unincorporated areas. The City of Los Angeles, for example, runs its own LID program under its own ordinance. A City report from April 2026 states that under the current ordinance most small-scale projects, including the majority of ADUs, are no longer subject to its LID requirements. In Orange County the equivalent document is the WQMP.

Examples from our projects

Altadena is unincorporated, so rebuilds there are permitted through the County. We prepared the civil drawings for permit on two fire rebuilds in Altadena, one with structural and civil engineering and one with structural, civil and MEP engineering.

Common questions

Does a single-family house need LID in Los Angeles County?

In the unincorporated areas, a project of four units or fewer that adds or alters 50 percent or more of the existing impervious area installs at least two LID measures. Below 50 percent it is exempt.

What are the two BMPs for a small residential project?

Any two from the manual's list, such as a 200-gallon rain barrel and two 15-gallon trees with a weather-based irrigation controller.

What is the SWQDv?

The stormwater quality design volume: the runoff from the greater of the 0.75-inch or the 85th percentile, 24-hour storm.

Is a restaurant a priority project?

A new or redevelopment project that includes a restaurant and creates or replaces 5,000 square feet or more of impervious area is on the priority list.

Do fire rebuilds have to comply?

A small residential rebuild that affects more than 50 percent of the existing impervious area does. Replacing a foundation in the same place is given as an exempt example.

How we help

We prepare the LID plans and calculations with the grading and drainage plans and the hydrology study for projects in Los Angeles County. Where infiltration is proposed, the soils data comes from a geotechnical engineer. We do not provide geotechnical services, and we coordinate with the geotechnical engineer on the project.

Sources

Checked November 23, 2026. This article is general information, not advice for a specific project. Some County handouts predate the 2025 manual, so confirm the current requirements with Los Angeles County Public Works and the district office that will review your plans.