How to Read a Panel Schedule, and What Plan Check Asks For

Electrical panel with hand-labeled circuit breakers

A panel schedule is a table that lists every circuit in one electrical panel: the breaker that protects it, what it feeds, and the load on it, with the total for the panel at the bottom. Read the header first, then the circuits, then the totals. The header tells you what the panel is, and the totals tell you whether it has room.

This guide explains the parts of a schedule, how to read the numbers, and what California building departments ask a schedule to show. The agency requirements come from the sources listed at the end, checked on November 23, 2026.

The header: what the panel is

Offices lay schedules out differently, but the header carries the same kinds of information:

  • Panel name and location. The same name appears on the single-line diagram and on the floor plan.
  • Voltage, phase and wires. For example 120/208 volts, three-phase, four-wire.
  • Bus rating. The ampere rating of the panel itself.
  • Main. Either a main breaker, with its size, or main lugs only, which means the panel is protected by a breaker upstream.
  • Fed from. The equipment that supplies the panel.
  • Interrupting rating. The fault current the panel and its breakers are rated for. See available fault current and AIC rating.

The circuits: one row each

  • Circuit number. Odd numbers run down one side and even numbers down the other, matching the breaker positions in the panel.
  • Breaker. The ampere size and the number of poles. A two-pole or three-pole breaker takes two or three positions.
  • Description. What the circuit feeds: "receptacles, room 104" or "RTU-2".
  • Load. The load on the circuit, usually in volt-amperes, placed in the column for the phase it lands on.
  • Spare and space. A spare is a breaker with nothing connected. A space is an empty position with no breaker.

The totals: whether the panel has room

  • Connected load. The sum of everything on the panel.
  • Demand load. The load the code calculation actually requires the panel and its feeder to carry, after the demand factors the electrical code allows for some load types are applied.
  • Amperes. The demand load converted to amperes at the panel voltage, which is the number to compare with the bus and the main.
  • Phase balance. The load on each phase, which the designer keeps close to even.

One term to know is the continuous load: a load expected to run at its maximum current for three hours or more, such as general lighting in a store. The California Electrical Code sizes conductors and overcurrent protection for the continuous load at 125 percent, which is why plan check wants continuous loads identified.

What plan check asks the schedule to show

The City of Calabasas publishes its electrical plan check requirements, dated March 2026 and written for the 2025 California Electrical Code. For panel schedules and load calculations it asks for:

  • Panel schedules and load calculations for every panel affected by the project.
  • The description and wattage of each load.
  • All continuous loads clearly identified.
  • The voltage and ampere rating of all equipment.
  • The size and type of each breaker and fuse.
  • All existing and proposed subpanels and their loads.
  • New, relocated or re-fed equipment marked clearly, and unchanged equipment marked existing.
  • Total wattage and calculated loads on the panels and feeders, with the service load calculation in amperes.

The City of Sacramento's list for electrical plan check includes the interrupting ratings of the service and the panelboards. The City of Los Angeles correction list asks for the electrical rating of the panelboards, breakers and other equipment.

The schedule on paper and the directory in the panel

The schedule on the drawings has a counterpart in the field. Section 408.4 of the California Electrical Code, as quoted in a state handout on the 2022 edition, requires every circuit, and every circuit modification, to be legibly identified by its clear, evident and specific purpose or use. Outside one- and two-family dwellings, panelboards supplied by a feeder also have to be permanently marked to show where their power comes from. The directory card on the panel door is where that identification lives. A schedule that says "lights" six times will produce a directory that says the same.

Existing panels in a tenant improvement

For a tenant improvement the panel is usually already there, so the schedule starts from a field survey: the panel nameplate, the breakers actually installed and what each one feeds. Agencies ask for existing and new circuits to be told apart. If the existing loads cannot be established from the panel, the engineer has to establish them another way before adding to it. See EV charger load calculations for how added load is checked against an existing service.

Examples from our projects

For an office tenant improvement in Los Alamitos, the field survey recorded six electric meters and the tenant panels they feed, and that record is the basis of the electrical design. For a commercial kitchen in San Diego, the electrical set included a new kitchen sub-panel and its panel schedules, on a single-line diagram that starts at the building's 3,000-ampere service.

Common questions

What is a panel schedule?

A table listing each circuit in an electrical panel, with its breaker size, what it feeds and its load, and the panel totals.

What does MLO mean on a panel schedule?

Main lugs only. The panel has no main breaker of its own and is protected by a breaker upstream.

What is the difference between connected load and demand load?

Connected load is the sum of everything wired to the panel. Demand load is the calculated load the panel and feeder have to carry under the electrical code.

What is a continuous load?

A load expected to run at maximum current for three hours or more. Plan check asks for continuous loads to be identified.

Is a panel schedule the same as a load calculation?

No. The schedule covers one panel. The load calculation shows that the service and feeders can carry the whole building.

Is a panel schedule the same as the directory on the panel door?

They carry the same circuit information. The schedule is on the drawings, and the directory is the identification the code requires at the panel.

How we help

We prepare panel schedules, single-line diagrams and electrical load calculations as part of our electrical engineering scope, from a survey of the existing equipment where there is one. Related reading: what a single-line diagram shows.

Sources

Checked November 23, 2026. This article is general information, not advice for a specific project. Requirements differ by agency and change over time, so confirm them with the building department that will review your plans.

Ready to send the plans?

Share the drawings and the project address. Fee and schedule are quoted per project after review.