There is no statewide rule that every ADU needs a grading and drainage plan. Each city or county decides. The published examples tie the request to new construction, above all a new detached ADU, which adds roof and paving and changes where rainwater goes.
This guide covers when agencies ask, what the plan shows, the numbers a reviewer checks, and what to send a civil engineer. The agency examples are from the sources listed at the end, checked on November 23, 2026.
What agencies ask for
| Agency | What it publishes for ADUs |
|---|---|
| City of Covina | A separate grading and drainage plan is required for detached accessory dwelling units, as it is for new buildings, detached garages and retaining walls. |
| City of Chico | ADUs require an on-site grading plan that confirms the existing drainage patterns and shows how the lot will drain. |
| City of Corona | Its ADU guide calls for a grading plan prepared by a California licensed civil engineer. |
| County of Los Angeles | Its sample ADU submittal list asks for grade elevations on the site plan and the top or toe of any slope, and a drainage plan "when required", showing the site drainage patterns and the drainage devices. |
In Covina's list a detached ADU sits beside new buildings and detached garages. The question in each case is the same: whether the water from the new building leaves the lot the right way.
What usually triggers the request
- A new detached ADU. New foundation, new roof, new paving.
- A sloping lot. The County of Los Angeles asks for the top or toe of any slope on the site plan, and grading there may need its own permit.
- A retaining wall. Covina lists retaining walls among the work that needs a separate grading plan. See retaining wall permits in California.
- Earthwork above the local exemption. Each agency sets its own threshold for a grading permit.
- Stormwater rules. In unincorporated Los Angeles County, a project of four units or fewer that adds or alters 50 percent or more of the existing impervious area installs two Low Impact Development measures. See LID requirements in Los Angeles County.
A garage conversion or an ADU within the existing house adds no foundation, roof or paving. Check the city's ADU checklist for whether it still asks for a drainage plan.
What the plan shows
Covina's guidelines give a representative list. A grading and drainage plan there includes:
- Property lines with dimensions and bearings, easements and setback lines.
- Existing and proposed structures.
- Existing topography, at contour intervals of 2 feet or less.
- The finished floor and finished pad elevations, and the grades next to them.
- Spot elevations that confirm the slopes, and arrows that show the direction of runoff.
- Swales, with their high points and flow line elevations.
- Drainage structures, with details.
- The sewer lateral and cleanout, the water meter and existing trees.
- Estimated earthwork quantities, and the erosion control plan.
The civil engineer's name, signature and stamp go on the plan, and Covina has the engineer sign a drainage certification and a final grading certificate when the work is done.
The numbers a reviewer checks
- Away from the building. The California Building Code calls for the ground to fall 5 percent for 10 feet from the foundation, and paved surfaces within 10 feet to fall 2 percent. See the slope rule in full.
- Along the swales. Covina asks for graded swales at 1 percent minimum toward the street or outlet.
- Across the pad. Covina asks for 2 percent minimum toward the outlet.
- At the property line. Agencies such as the City of Orange do not allow drainage across lot lines. An ADU in a back corner, close to two property lines, has little room to show this.
Why the back yard is the hard part
A detached ADU behind the main house has to send the water from its roof and the yard around it to the street or an approved outlet, past the main house and inside narrow setbacks. The plan has to show that path with elevations: a side-yard swale, area drains and a pipe, or a measure that holds the water on the lot. Settling the ADU's floor elevation before the architectural drawings are finished avoids redrawing them later.
What to send the civil engineer
- A topographic survey of the lot, or the name of the surveyor preparing one.
- The architectural site plan and the ADU floor plan, with the proposed floor level.
- The city's ADU checklist and any comments already received.
- The soils report, if the city asked for one.
- Photographs of the yard, the side yards and the street frontage.
Examples from our projects
For a new residence in Garden Grove, the civil scope was the grading and drainage plans with the stormwater management and the hydrology report. For a pool and deck at a residence on a sloping lot in San Jose, the civil drawings for the site work were prepared for permit alongside the structural and MEP drawings.
Common questions
Does an ADU need a grading plan in California?
It depends on the city or county. Agencies such as Covina and Chico ask for one for ADUs. Ask the building or engineering department before the drawings are finished.
Does a garage conversion ADU need a drainage plan?
Covina's list names detached ADUs. A conversion that adds no building area is a different case, and the city's checklist will say.
Who prepares an ADU grading and drainage plan?
A civil engineer. Agencies such as Corona and Covina require the civil engineer's stamp.
Is a survey needed?
The plan is drawn on existing topography, so a topographic survey is the usual starting point.
Is a soils report needed?
Covina asks for a soils and geology report in hillside locations. The County of Los Angeles notes that one may be required by the local jurisdiction.
How we help
We prepare grading and drainage plans for ADUs as part of our ADU engineering and civil engineering services, and we answer the plan check comments on our scope. We do not provide geotechnical services, and we work from the survey and the soils report prepared for the project. Related reading: Title 24 for an ADU and how to read a grading plan.
Sources
Checked November 23, 2026. This article is general information, not advice for a specific project. Every city and county sets its own ADU submittal requirements, so confirm them with the agency that will review your plans.
- City of Covina Public Works, Grading Plan Submittal Guidelines
- City of Chico, Development Engineering building permit checklist for ADUs
- City of Corona, Accessory Dwelling Units from start to finish
- County of Los Angeles Public Works, Minimum Plan Submittal Requirements, ADU example
- County of Los Angeles Public Works, Low Impact Development Standards Manual, 2025
- City of Orange Public Works, Grading Permit Plans Preparation guidelines and checklist